VALIDATION CENTER

Evidence before narrative.

Measured, historical, target, simulated, and pending values remain separate.

MEASURED36 / 36

Later safety and correctness checkpoint.

MEASURED0%

C1 physical VRAM reduction.

MEASURED−10.745%

C1 throughput change.

HISTORICAL25 + 7

Earlier passed and skipped checkpoint.

PRODUCT GATE≥30%

Target physical VRAM reduction.

PRODUCT GATE≥−3%

Maximum throughput degradation.

PENDINGTTFT

Matched physical measurement.

PENDINGH100 / B200

Datacenter validation.

PENDINGvLLM

Production low-bit KV integration.